Talk:Layout

From Makespace
Revision as of 19:07, 6 March 2012 by Laura (Talk | contribs)

Jump to: navigation, search

Looking at the flooplan and the vimeo video, there appears to be a distinct lack of plumbing. Both for The Kitchen and for the workshop space, which if you are planning anything wet (painting, DCM, FeCl3 etching, fluid computers, etc), will need to be provided separately. Potentially H&S may want a separate handwash as well in the workshop.

I saw something about pre-existing University IP sockets. You might expect at least some members to have access to this through work/college normally. If the University is inclined (or can be convinced) it might be worth seeing if some could be retained (or wireless access provided) as this could provide some relief to your IP connection bandwidth.

I have no experience with setting up light engineering but do with chemical/wet labs. Let me know if there is anything I can help with. Zebedeeboy 00:12, 6 March 2012 (UTC)

THanks! Yes, you're right, there's no plumbing in place. We'll need to plumb water in for the kitchen. We've not planned any plumbing for the workshop area yet, althoguh the line for the kitchen will come in to our space thereabouts. At the moment I'm trying to put together the minimum work plans to get us started, so that we don't waste any money in the early stages when our cash flow is hard to predict.

Whether we can use the University network at all is under investigation/discussion. I wouldn't say this is at all guaranteed; if we can't get access for all, then it will most likely be no access for anyone, as policing approved uni users vs non-uni people will be hard/impossible; and if we want any access at all we'll need to get network management in place, which is unlikely to happen unless we get general access approved. It would be a pity not to be able to use all the existing, new-looking wiring though.

Laura James 19:07, 6 March 2012 (GMT)