Things to do and who is responsible
This is the list of things that need to be done before we can open to the public. In some cases there's a responsible person noted and if you are thinking of things in that area or want to do some work which hasn't been planned or agreed, please talk to that person first and check that what you'd like to do fits with the communith plans.
What does it mean to be responsible for one of these areas?
The main thing here is not that someone volunteers to do all the work, but that they take responsibility for making sure stuff happens, whether that means doing it themselves or working with others. For most tasks, this means thinking what's possible, checking with the community (eg on this list or in a meeting) what's wanted, maybe getting the community to choose from some options, checking how the money looks (for things we'll buy from core funds - meaning talking to me/Simon/Jonny), and then making stuff happen :) . We need to share the tasks we have between us so no one collapses from overwork, and there's lots of different things to do so hopefully everyone can find something they enjoy.
- floor in secure workshop
- walls in secure workshop - bits more paint needed
- carpet tiles
- kitchen - fitting
DanR
- fire detection
Laura
- beanbags / sofas and other chairs etc for kitchen and mezzanine social space
Henry
- need tables and chairs
tables being offered generally free (several offers already in)
silvermans - second hand office kit - check for chairs
need to work out what chairs we want - stacking or folding for classroom - needs further discussion
- signs (for outside the door)
Laura has spec for these, but happy for someone else to step up to design and order them
- get fablab bits of kit inc shopbot
need to work out exactly what, and what budget. In terms of kit we will do a survey to find out what priorities of wider community are, this will help us know when we are suffciently kitted out to feel good about opening.
- layout of secure workshop and bench positions etc
JOhn Sturdy
looks tight but shoudl work if we have good extraction :)
- lead times for critical kit - and what infrastructure is needed (eg extraction)
- specify what's critical kit - first, do survey of mailing list what they want to do
Laura
- RCDs & locks on cabinets
Brian (thanks!)
- permissions for sign on Mill Lane / Silver st (sandwich board)
Directors will look into this
- mat for front door
- Trained first aiders and better first aid policy
- trained fire marshalls and better fire risk assessment
Laura to do risk assessment.
- new fire extinguishers
(depends on outcome of fire risk assesssment)
- capacity limits and writing these down
Directors. (current *rough* estimate: 120 people max in the space)
- new health and safety policy
Directors