Equipment/VacuumFormer/RiskAssessment
Activity
Insert brief abstract of the activity to be assessed here
[edit] Hazard identification
Consider the hazards involved in conducting this activity and list each hazard
Hazard 1 Hazard 2 Hazard 3
[edit] Persons at risk
Consider who might be put at risk by the hazards listed above
Persons Persons Persons
[edit] Initial assessment of risk
Hazard identified
Severity
Probability
Risk Factor
Hazard 1 1~5 1~5 Severity x probability Hazard 2 1~5 1~5 Severity x probability Hazard 3 1~5 1~5 Severity x probability
Categorising the risk level as 1-4(Low), 5-9(Moderate), 10-15(High) or 16-25 (Unacceptable) shows that the potential level of risk in this activity is ########. Further measures are needed/not needed to reduce the risk to an acceptable level.
[edit] Control measures
Necessary control measures arising from the hazard identified of ####### are: Necessary control measures arising from the hazard identified of ####### are: Necessary control measures arising from the hazard identified of ####### are:
[edit] Final assessment of risk
The assessed risk taking into account the implementation of the control measures listed, and adherence to the SSOW (Safe System of Work) if applicable is as follows:
Hazard identified
Severity
Probability
Risk Factor
Hazard 1 1~5 1~5 Severity x probability Hazard 2 1~5 1~5 Severity x probability Hazard 3 1~5 1~5 Severity x probability
When completing Risk Assessment please consider the if First Aid assistance might be appropriate if the calculated Risk level (Severity x Probability) is greater than 5
The risk now falls into the category ####### and is considered to be acceptable.
Authorised by
Sign:
Print:
Date: