Difference between revisions of "Meetings/Planning22-11-2012"
From Makespace
(Created page with "Draft agenda: * What shall we buy in Nov with allocated £1000? Kit wishlist: basic infrastructure budget * Electrical safety policy - polish up, write PAT testing checklist...") |
|||
Line 3: | Line 3: | ||
* What shall we buy in Nov with allocated £1000? [[Kit wishlist: basic infrastructure budget]] | * What shall we buy in Nov with allocated £1000? [[Kit wishlist: basic infrastructure budget]] | ||
* Electrical safety policy - polish up, write PAT testing checklist | * Electrical safety policy - polish up, write PAT testing checklist | ||
− | * What needs doing or buying before we can open? If we start with "the fablab" set of kit from [[Kit wishlist]] what are we missing? What has long lead times that we might need to buy soon? What other tasks (other than final detailing on paint) | + | * What needs doing or buying before we can open? If we start with "the fablab" set of kit from [[Kit wishlist]] what are we missing? What has long lead times that we might need to buy soon? |
+ | * What other tasks (other than final detailing on paint, and fire detection) need doing before we can open? What can we do and what do we need contractors for? |
Revision as of 14:36, 21 November 2012
Draft agenda:
- What shall we buy in Nov with allocated £1000? Kit wishlist: basic infrastructure budget
- Electrical safety policy - polish up, write PAT testing checklist
- What needs doing or buying before we can open? If we start with "the fablab" set of kit from Kit wishlist what are we missing? What has long lead times that we might need to buy soon?
- What other tasks (other than final detailing on paint, and fire detection) need doing before we can open? What can we do and what do we need contractors for?