Search results

From Makespace
Jump to: navigation, search

Page title matches

  • ...potential 'owner' of the kit, who is the responsible person, needs to do a risk assessment first. Sometimes we'll need to review or redo these for items w ''Kit without approved risk assessments and appropriate safety kit or processes in place may be removed
    17 KB (2,680 words) - 22:35, 24 July 2013
  • # The main risk is eye damage: the small drills and other tools sometimes break or grab the '''Persons at risk'''
    3 KB (427 words) - 23:40, 31 March 2013
  • # The most likely risk from soldering is that of minor burns, from accidentally picking up a hot o # There is also a minor risk from misusing the pickle (a mild corrosive, used warm), especially from the
    2 KB (355 words) - 21:43, 3 April 2013
  • ...he flame itself, although a secondary (lower severity, higher probability) risk exists of handling material that is no longer incandescent but which remain ...ions of glass splinters including the possibility of eye damage. A similar risk of eye damage occurs when using the torch due to thermal cracking of glass
    4 KB (639 words) - 01:41, 19 April 2013
  • = Formal Risk Assessment for the Vinyl Cutter (Silver Bullet) = ...operator. However, the workpiece is likely to be thin and flexible, so the risk is more of a paper cut than blunt force.
    4 KB (560 words) - 10:27, 3 November 2014
  • = Formal Risk Assessment for the EggBot = * The accessories are very small and can be sharp. Usual risk if swallowed or mishandled.
    3 KB (461 words) - 14:53, 3 February 2015

Page text matches

  • '''[[Formal Risk Assessment: Glassworking]]'''
    15 KB (2,620 words) - 14:50, 14 July 2021
  • * Extractor hood/fan to reduce dichloromethane inhalation risk ...o talk to the landlord about - they've flagged up that the additional fire risk would mean we need to talk about fire barriers etc and can't go ahead witho
    14 KB (2,150 words) - 14:37, 20 February 2020
  • ...(no loose wires!) and aren't left on unattended (in case there is any fire risk).
    11 KB (1,955 words) - 13:13, 17 October 2012
  • - Fire risk assessments and responsible people - First aid risk assessments and responsible people
    16 KB (2,834 words) - 14:08, 20 February 2020
  • ...les, or signage, or extra flashing alarms, or whatever) - according to our risk assessment
    744 B (137 words) - 09:49, 17 October 2012
  • ...cy Drafting]], [[General Risk Assessments]], [[Equipment Activity Material Risk Assessments]]
    1 KB (219 words) - 21:26, 21 June 2018
  • ... Aid Policy]], [[General Risk Assessments]], [[Equipment Activity Material Risk Assessments]], [[Electrical safety policy]] ... various risks, and alongside it we will have a set of Risk Assessments. A risk assessment isn't a big scary thing: it's just a way of setting out: (1) wha
    6 KB (1,143 words) - 14:09, 20 February 2020
  • * Zoning needs to be based on (a) risk / access control, (b) mess and (c) noise.
    5 KB (749 words) - 14:00, 26 October 2012
  • ...ember that, of course, anything left at Makespace is stored at the owners' risk. ...ary responsibility is to get yourself, and (if possible without additional risk to yourself) others, out of the building and then call the fire service.
    5 KB (858 words) - 16:38, 7 April 2017
  • ...tps://web.makespace.org/hosting-an-event ''', complete the google form and risk assessment templates as per instructions there. The password is the same as ...web.makespace.org/hosting-an-event, complete the google form checklist and risk assessment templates as per instructions there. The password is the same as
    17 KB (3,077 words) - 11:08, 19 December 2023
  • * Health and Safety & writing risk assessments for upcoming activities (painting?) * risk assessment
    9 KB (1,579 words) - 20:34, 31 October 2012
  • ...rinter filaments, cleaning substances, adhesives, etc. These may present a risk to anyone in the space if materials not stored and used appropriately.
    2 KB (334 words) - 10:37, 26 November 2012
  • ...ent done by laura if not something obviously very safe or already here and risk assessed. You should do this before bringing something in, because even if
    7 KB (1,304 words) - 13:11, 30 November 2012
  • * Risk assessments for a bunch of bits of kit (talk to the current owners). * help with reviewing risk assessments (would be much appreciated - when assessments are posted on lis
    3 KB (465 words) - 18:50, 6 April 2013
  • * Walk through Fire risk assessment?
    698 B (116 words) - 16:54, 6 December 2012
  • * Whether there's any '''specific risk assessment''' or '''health and safety preparation''' needed
    2 KB (327 words) - 15:16, 7 January 2014
  • ...potential 'owner' of the kit, who is the responsible person, needs to do a risk assessment first. Sometimes we'll need to review or redo these for items w ''Kit without approved risk assessments and appropriate safety kit or processes in place may be removed
    17 KB (2,680 words) - 22:35, 24 July 2013
  • ... more. Owners are responsible for training, maintenance, documentation and risk assessment for the equipment. Typically the person who proposed obtaining t === Perform A Risk Assessment ===
    8 KB (1,385 words) - 01:16, 19 November 2015
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    3 KB (530 words) - 14:57, 29 June 2020
  • The risk assessment is at [[Equipment/lathe/RA]].
    4 KB (712 words) - 02:40, 21 June 2018
  • ...gles. Using expensive or precious materials in the router is at the user's risk!'''}} Full Risk assessment[[File:CNC_Router.pdf ‎]]
    29 KB (4,867 words) - 09:11, 10 February 2020
  • ...g or CAD applications. At the same time, it is an expensive tool with real risk of injury and fire, so is very important you know how to use it to avoid da ... to about 2mm. It's not a great quality cut, but just about doable. Fire risk.
    24 KB (4,163 words) - 17:36, 20 February 2022
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire. * Risk assessment: https://docs.google.com/viewer?a=v&pid=forums&srcid=MDgwNzUyNzQ
    4 KB (644 words) - 20:22, 21 June 2018
  • *Risk assessments – what needs to be done?
    4 KB (627 words) - 15:43, 22 June 2019
  • |Risk assessments – what needs to be done?
    20 KB (3,362 words) - 19:08, 21 June 2018
  • - need a policy for how we risk assess * kit risk assessments & c
    7 KB (1,330 words) - 22:29, 12 February 2013
  • *Risk assessment **Overall risk assessment for the club - '''Brian'''
    4 KB (600 words) - 19:08, 17 February 2013
  • ... (grounded) power tools. Unmodified plugs and matching outlets will reduce risk of electric shock. ... such as pipes, radiators, ranges and refrigerators. There is an increased risk of electric shock if your body is earthed or grounded.
    4 KB (625 words) - 20:01, 21 June 2018
  • * Set Of 12 Needle Files, 16cm (restricted use due to contamination risk)
    13 KB (1,635 words) - 17:03, 17 August 2013
  • * Overall risk assessment for the group in the space * Review and enhance risk assessments for specific equipment if required
    2 KB (264 words) - 22:28, 17 March 2013
  • * Overall risk assessment for the group in the space * Review and enhance risk assessments for specific equipment if required
    2 KB (371 words) - 05:18, 3 April 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire. ...s to rain or wet conditions. Water entering a power tool will increase the risk of electric shock.
    4 KB (602 words) - 08:37, 19 May 2018
  • # Complete [[Kit or activity Risk Assessment process]]
    507 B (87 words) - 23:05, 6 April 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire. ...s to rain or wet conditions. Water entering a power tool will increase the risk of electric shock.
    5 KB (768 words) - 16:07, 3 May 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    1 KB (170 words) - 19:04, 30 November 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire. ...s to rain or wet conditions. Water entering a power tool will increase the risk of electric shock.
    3 KB (392 words) - 16:08, 3 May 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire. ...s to rain or wet conditions. Water entering a power tool will increase the risk of electric shock.
    2 KB (391 words) - 18:57, 26 March 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    4 KB (597 words) - 16:09, 3 May 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    3 KB (562 words) - 07:01, 30 March 2013
  • [[Formal Risk Assessment]] The main risk is eye damage: the small drills and other tools sometimes break or grab the
    3 KB (505 words) - 17:36, 18 May 2018
  • [[Formal Risk Assessment: Fine Metalwork Hand Tools and Silver Soldering]]
    24 KB (3,941 words) - 16:07, 8 May 2022
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    3 KB (569 words) - 03:06, 3 August 2013
  • # The main risk is eye damage: the small drills and other tools sometimes break or grab the '''Persons at risk'''
    3 KB (427 words) - 23:40, 31 March 2013
  • # The most likely risk from soldering is that of minor burns, from accidentally picking up a hot o # There is also a minor risk from misusing the pickle (a mild corrosive, used warm), especially from the
    2 KB (355 words) - 21:43, 3 April 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    4 KB (613 words) - 20:58, 27 January 2020
  • - '''Risk assessment:''' We decided that we would start with Makespace's risk assessment and modify as necessary. 7) Elizabeth has templates for risk assesments and curriculum design that she can share with us
    4 KB (642 words) - 05:19, 9 April 2013
  • * Equipment will be checked for defects before each use to minimise the risk of possible electrical faults or fire.
    6 KB (919 words) - 20:49, 21 June 2018
  • - '''Risk Assessment''' - We continued our discussion of risks that might be unique t
    3 KB (563 words) - 05:50, 9 April 2013
  • ...he flame itself, although a secondary (lower severity, higher probability) risk exists of handling material that is no longer incandescent but which remain ...ions of glass splinters including the possibility of eye damage. A similar risk of eye damage occurs when using the torch due to thermal cracking of glass
    4 KB (639 words) - 01:41, 19 April 2013
  • === Streamline risk assessment process === ... sign and file it more quickly. Record the signed timestamp, but leave the risk assessment editable to encourage continuous update and revision.
    5 KB (745 words) - 19:26, 21 June 2018

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)